三分彩-baidupaiming.net

OTC robot maintenance routine maintenance-V series robot

Today mainly introduces the daily maintenance of OTC robot maintenance. We all know that OTC robots can be divided into V series (V6, V6L, V8, V8, V20, etc.) and B series (B4, B4L, B6, B6, etc.), This article mainly introduces the daily maintenance content of V series OTC robot maintenance. For details, please see the table below.

NO an examination maintain position project Corrective Action
daily 90 days 1 year 3 years 6 years
1 an examination overall appearance Adhered welding slag, dust or other foreign matter Visual inspection and cleaning
2 an examination Tag panel Peeling and fouling Visual inspection
3 an examination • External cable Scratches, stains, and loose connectors Visual inspection
4 an examination Welding gun bracket Cracks and deflections Visual inspection of replacement parts
5 an examination Torch aiming point Offset Perform a visual inspection using the origin inspection program.
Loose Load the front, rear, left, and right forces near the output flange of the J6 axis, and then feel by hand
6 an examination Welding torch Loose cable connection Retighten
Tip wear Change tip
Welding slag attached to tip Clean or replace
Welding slag adheres to welding gun installation clean
7 an examination Wire Feeder Worn feed roller Visual inspection, inspection and replacement if necessary
Oil or dust on the tensioner and feed roller clean
8
an examination
• Coaxial cable The cable is scratched or bent Visual inspection, inspection and replacement if necessary
•trachea Worn or bent liners Visual inspection, inspection and replacement if necessary
• Welded cable Broken and leaky hose Check with soap and water and replace
• cable tube Loose cable connection Retighten
9 an examination Main bolt Loose Retighten
10 an examination Connector housing base Loose Retighten
11 an examination Brake Operating brake No noise or vibration when the servo is on.The robot arm will not fall when the servo is off.
12 an examination an examination Internal wiring Loose installation bolts for damaged cables Check visually and re-tighten if necessary ^
replace replace replace
13 replace replace replace Reducer Jl, J2, J3 shaft Replenish Replenish
Reducer abnormal Replace the reducer
14 replace replace replace Reducer J4, J5, J6 shaft Replenish Replenish
Reducer abnormal Replace the reducer
15 an examination an examination replace Belt (J5, J6 shaft) Tension strength of the belt Adjust tension
Abnormal belt replace
16 replace replace replace Crossed roller bearings (J4 shaft) Replenish Replenish
Crossed roller bearing abnormal replace
17 an examination replace replace battery replace replace
Through the above table, we can know the daily maintenance content of V series OTC robot maintenance in detail . Usually when we use OTC robots, we only need to do the maintenance work according to the time axis of this table. The above table has inspection and replacement. There are two kinds of places that need to be replaced. I have marked them in red. The boss must pay attention to the time when it is time to replace the accessories. Be sure to replace them. Do not think that they are not damaged for the time being and you can not use them. Now, this may cause problems at critical times and delay production, so what we have to do is to make robots better serve us and create more value.

OTC robot maintenance routine maintenance-V series robotThis is the introduction here, and I hope to bring you help. If you need to buy any OTC accessories, you can contact me. At the same time, our company also provides OTC robots and welding and cutting machine maintenance services, Hefei, Wuhu, Maanshan , Huainan, and other places we can provide on-site repair services on the same day, and other provinces can provide remote services. Our company is an OTC-designated agent. All accessories are guaranteed to be genuine. Contact number: 180-9663-1656, and you are also welcome to add me on WeChat. Exchange the relevant knowledge and experience of OTC welding machine with me .

CATEGORIES

CONTACT US

Contact: Fang

Phone: 0622-57735213

Tel: 180-9663-1656

Email: whpmbfstw@163.com

Add: Tianjie 1-1520, Jindadi Times, Hefei Economic Development Zone, Anhui Province